Phase 11 Wave 0 Terminal Receipt¶
State: CLOSED AND PRESERVED — MAXIMUM REPOSITORY COMPLETION
Decision: ENTRY_BLOCKED_EXTERNAL
Governing issue: #112
Claim merge: 6b9e7cabeebd5ade9b998b8a54bcd2c888e6bfe4
Implementation PR/head: #512 / 1befa902def70d2c997aaba260e0d8e2a5d4b12d
Implementation merge: f561658d140aaf214fa6eaca99c80bcc98ee284f
Closeout PR/head: #513 / 1e4291ef669ca01eb4f639b2f1734a85d8448a63
Closeout merge: 632dd0bdbb2a3b8c24bd285918deff3e54bd3ba9
Technical evidence SHA-256: 7480a398c6ed7a612ce1c2e44706221f1722e626a2841fe0598662d62471bdf9
PILOT_ENTRY_APPROVED: false
PRIMARY-PILOT evidence count: 0
Phase 12 authorization: false
Repository finishing-line result¶
The repository now has a deterministic finishing-line control package:
- refreshed official-source Zambia DPC, Data Protection Act, CCPC and Firebase evidence;
- a structured Wave 0 evidence manifest and schema;
- a fail-closed gate evaluator;
- an exact technical-preflight contract;
- an owner/regulator/counsel/provider action packet;
- a permanent CI contract that rejects unsupported gate closure or pilot activation.
Current terminal decision¶
ENTRY_BLOCKED_EXTERNAL is required because actual authority evidence has not been supplied for the hard gates. Repository readiness and official-source research cannot substitute for:
- DPC controller/processor registration outcome;
- DPC overseas storage/transfer authorization or qualified exact-topology determination;
- qualified Zambia privacy and consumer/marketplace review;
- approved notice and data-lifecycle schedule;
- signed Wave 1 scope and accountable roles;
- approved Firebase Zambia console configuration;
- managed real-environment invitation/auth/consent, private-storage and withdrawal/deletion canaries;
- final Wave 1 deployment and support/incident receipts.
Gate state¶
The canonical machine-readable result is in PHASE11_WAVE0_EVIDENCE_MANIFEST.json.
- P11-G01 through P11-G13 remain open until their required evidence exists.
- P11-G14 is CLOSED for repository source
1befa902def70d2c997aaba260e0d8e2a5d4b12dafter the complete exact-head matrix passed; this does not close P11-G12 or any external gate. - P11-C01 is not applicable to the initial no-field-claim wave.
- P11-C02 through P11-C06 remain disabled.
- P11-C07 remains not applicable because automated registry access is excluded.
No false completion¶
This receipt does not close Phase 11. It does not assert that a real controlled pilot ran, that any participant consented, that any provider submitted real evidence, or that 11C–11H metrics exist. It records the maximum truthful repository completion before external authority and owner evidence.
Exact-head evidence¶
The finishing-line implementation passed Wave 0, readiness, RC11, W7 Android/backend/database/OpenAPI, deterministic generated clients, customer/provider PWA, W8, supply-chain, documentation and RC5–RC10 contracts through runs 30307945800, 30307945818, 30307945934, 30307945768, 30307945872, 30307945906, 30307945756, 30307945870, 30307945784, 30307945769, 30307945849, 30307945921, 30307945959, 30307945868, 30307945894, 30307945776, 30307945858, 30307945856.
Closeout rule¶
The repository lane is released. The terminal decision remains ENTRY_BLOCKED_EXTERNAL unless actual external evidence is supplied, independently reviewed where required and entered through the protected manifest process. A later evidence-reconciliation lane requires a new explicit claim.