DIREKT Documentation Index¶
This index lists the authoritative planning and operating documents. Agents must follow the reading order in AGENTS.md and the active phase in PROJECT_STATUS.md.
Mandatory control set¶
README.mdAGENTS.mdMASTER_BUILD_PLAN.mdPROJECT_STATUS.mdWORKSTREAM_LOCK.mdDEFINITION_OF_DONE.mddesign.md
Analytics¶
Android¶
- Phase 2A Android Foundation
- Android Module Map
- Android Product Specification
- Device Compatibility
- Internationalization and Localization
- iOS Future Compatibility
- Local Storage
- Navigation Specification
- Performance Budgets
- Permissions
- Play Store Release
- State Management
API¶
Architecture¶
- Admin Portal Architecture
- Android Architecture
- API Contract
- Architecture Decisions
- Backend Architecture
- Database Design
- Environment and Configuration
- File Storage Architecture
- Integration Architecture
- Location Architecture
- Notification Architecture
- Observability
- Offline and Sync
- System Architecture
Backend¶
- Phase 2B Backend and Data Foundation
- Phase 4 Verification and Private Evidence Engine
- Audit Logging
- Authentication and Authorization
- Backend Functional Specification
- Backup and Recovery
- Booking and Contact Model
- Data Dictionary
- Data Retention
- Job and Queue Design
- Payment Model
- Search and Discovery
- Subscription Model
Design¶
- Phase 1B Exit Review
- Phase 1B Heuristic Review
- Phase 1B Prototype Specification
- Accessibility
- Android UI Specification
- Content and Microcopy
- Design System
- Information Architecture
- Prototype Testing
- Responsive Admin Design
- Screen Inventory
- User Flow Diagrams
General¶
Phase checkpoints¶
- Phase 8 Interaction Trust Contract
- Phase 8 Validation and Exit Matrix
- Phase 9 Handoff from Phase 8
- Phase 9 Commercial Trust Contract
- Phase 9 Validation and Exit Matrix
- Phase 10 Handoff from Phase 9
- Phase 10 Infrastructure Activation Contract
- Phase 10 Closeout
- Phase 11 Handoff from Phase 10
- Phase 11 Execution and Entry Control
- Phase 11 Zambia Legal and Privacy Entry Research
- Phase 11 Maps and Sentry Reconciliation
- Phase 11 Pilot Validation Evidence Register
Integrations¶
Legal¶
Operations¶
- Agent Handoff Template
- Agent Workflow
- Android Release Runbook
- CI/CD
- Cost Guardrails
- Deployment Runbook
- Disaster Recovery
- Environment Strategy
- Launch Checklist
- Monitoring and Alerting
- Pages Usage
- Phase Completion Template
- Release Versioning
- Remote Android Testing
- Service Level Objectives
- Support Operations
- Verification Operations
Product¶
- Business Model
- Feature Catalog
- Marketplace Rules
- Monetization and Pricing
- MVP Scope
- Product Requirements
- Product Vision
- Roadmap
- User Journeys
- User Personas
- User Roles and Permissions
- Zambia Localization
Research¶
Phase 1A decision set¶
- Phase 1A Research Index
- Zambia Secondary Research Baseline
- Phase 1A Exit Review
- Phase 1A Handoff
- Assumptions Register
- Category Evidence Matrix
- Desk Research Register
- Legal and Regulatory Research
- Location and Addressing Research
- Payments and Communication Research
- Technology and Connectivity Research
Retained later-validation instruments¶
- Pilot Research Plan
- Research Plan
- Research Ethics and Consent
- Customer Interview Guide
- Provider Interview Guide
- Verification Operations Interview Guide
- Field Observation Guide
- Interview Note Template
- Fieldwork Execution Checklist
- Research Log
- Competitive Positioning
Security¶
- Abuse and Moderation
- Compliance Checklist
- Incident Response
- Location Privacy
- Privacy Model
- Public Repository Policy
- Secure Document Handling
- Security Model
- Terms Requirements
- Threat Model
Testing¶
- Acceptance Tests
- Android Test Plan
- Backend Test Plan
- Bug Severity Model
- Device Test Matrix
- Performance Test Plan
- Pilot Test Plan
- Quality Gates
- Security Test Plan
- Test Strategy
- Verification Test Cases